Long Beach heat pump installation: what the audit measures before the quote
LADWP Consumer Rebate and TECH Clean California HEEHRA stack on qualifying Long Beach heat pump projects, but the stack only files cleanly when the AHRI Directory match, the Manual J load report, and the HERS verification number all line up on the permit. Permits route through Long Beach Development Services. Counter permits 2–3 days residential HVAC; plan check 4–6 weeks for major scope. Selecting a 5-ton heat pump on a system that delivers 1,000 CFM through undersized returns. Title 24 requires ≥350 CFM/ton; the equipment runs short cycles, dehumidification fails, and the bedroom stays warm.
Federal 2023 minimum efficiency floor for split heat pumps in the Southwest region (which covers California) is SEER2 14.3, EER2 11.7, HSPF2 7.5 per DOE 10 CFR 430.32. ENERGY STAR cold-climate models hit SEER2 16.0 with capacity ratio at 5°F/47°F of at least 70%.
Average summer high near 83°F with winter low around 46°F at an elevation of 52 ft and direct ocean exposure. CEC Climate Zone 6 (south of 405 freeway) / 8 (north of 405 freeway) — explicit dual-zone city per Long Beach Building Department. The cooling design temperature for Manual J calculations runs about 86°F, with typical Manual J load landing in the 400-600 sq ft per ton band. Marcus Reyes, P.E. assembles the rebate documentation alongside the engineering report so the filings move on the same timeline as the install. Title 24 Part 6 §150.2(b).