Duct Redesign and Air Balancing planned for Highland Park living patterns and microclimate
Duct and return improvements for uneven rooms, dust bypass, oversized equipment, and weak airflow. That framing matters in Highland Park because the local building stock and code path push the scope in specific directions. duct leakage, filter cabinet upgrades, heat pump planning, and ADU or garage conversion comfort The audit names the constraint in writing before the proposal lands, so the homeowner knows whether they are buying equipment, duct work, electrical capacity, or all three.
Manual D total external static budget allocates 0.50 in. w.c. for PSC blowers, 0.80 for ECM. Friction rate FR = (TESP × 100) / Total Effective Length runs typically 0.06–0.10 in. w.c. per 100 ft. Return-air free-area rule is 144 sq in (1 sq ft) net per ton. Title 24 §150.0(m)11 new construction: total leakage ≤5% or ≤25 CFM per 100 sq ft conditioned floor area at 25 Pa.
Marcus Reyes, P.E. runs the load calc, the static pressure budget, and the AHRI match in a single engineering pass. Average summer high near 88°F with winter low around 46°F at an elevation of 535 ft and roughly 17 miles inland. CEC Climate Zone 9. The cooling design temperature for Manual J calculations runs about 96°F, with typical Manual J load landing in the 380-500 sq ft per ton band. The written report carries his signature and the supporting measurements.