Encino duct redesign and air balancing: what the audit measures before the quote
LADWP Consumer Rebate and TECH Clean California HEEHRA stack on qualifying Encino heat pump projects, but the stack only files cleanly when the AHRI Directory match, the Manual J load report, and the HERS verification number all line up on the permit. Permits route through LADBS. Multi-system properties often require coordinated permits; standard counter HVAC permits 1–3 days. Adding a 5-ton heat pump on a duct system designed for 3 tons. Static pressure goes vertical, supply CFM falls below 350 per ton, equipment ramps but rooms get less air. The duct system has to come first.
Manual D total external static budget allocates 0.50 in. w.c. for PSC blowers, 0.80 for ECM. Friction rate FR = (TESP × 100) / Total Effective Length runs typically 0.06–0.10 in. w.c. per 100 ft. Return-air free-area rule is 144 sq in (1 sq ft) net per ton.
Average summer high near 92°F with winter low around 46°F at an elevation of 774 ft and roughly 14 miles inland. CEC Climate Zone 9. The cooling design temperature for Manual J calculations runs about 102°F, with typical Manual J load landing in the 350-450 sq ft per ton band. Marcus Reyes, P.E. assembles the rebate documentation alongside the engineering report so the filings move on the same timeline as the install. NEBB/TABB Procedural Standards.